Day 31 | Starting the Kitchen

Day 31

John and his guys accomplished a lot today. They moved the original hutch from it’s current location to the wall being shared with the bedroom. They added new framing and a new beam that spans across the dining room and the kitchen (because we removed a load bearing wall), and removed most of the framing separating the kitchen and dining room. Kevin is working on creating blue prints that will be used to obtain our building permits.

Framing the small pony wall that will eventually be a small bar eating area.

Framing the small pony wall that will eventually be a small bar eating area.

Framing this small wall that will hide the side of the cabinets and fridge.

Framing this small wall that will hide the side of the cabinets and fridge.

Closing up the old door way between the family room and mudroom.

Closing up the old door way between the family room and mudroom.

Moved the hutch to the other side of the dining room. The back of it now sticks into the second bedroom.

Moved the hutch to the other side of the dining room. The back of it now sticks into the second bedroom.


HELPERS: Uncle John + Crew

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s